Municipal Urban Drainage Intelligence & Budget Optimizer
Ward 45 · Central Urban Basin (Pre-Monsoon 2026)
Active Budget Cap₹10,00,000
Municipal Budget₹10,00,000Fiscal Cap
Committed Spend₹9,10,00091% Allocated
Drains Funded7 / 8112 Crew-Hrs
Citywide Flood Risk Drop-174 ptsDirect Risk Alleviation
Cost Efficiency19.12Risk pts / ₹1.0 Lakh

🗺️ Ward 45 Drainage Asset Network

Live sync with Knapsack Optimizer: ⚡ Emerald Green = Funded for Desilting

8 Active Drains
⚡ Funded in Plan ▲ Unfunded High Risk ● Moderate ✓ Verified Clean
Municipal Resource Allocator

Budget-Constrained Pre-Monsoon Action Plan

Solves the binary knapsack problem to maximize citywide risk reduction under strict municipal fiscal caps.

Municipal Maintenance Budget₹10,00,000
₹1.0 Lakh₹5.0 Lakh₹12.0 Lakh₹25.0 Lakh
Allocated Spend₹9,35,00094% utilized · ₹65,000 buffer
Funded Interventions5 / 8 Drains118 crew-hours committed
Citywide Risk Reduced-203 ptsOverall risk down to 358 pts
Cost-Efficiency ROI21.71Risk points reduced per ₹1.0 Lakh

⚡ Approved Pre-Monsoon Work Orders (Ranked by ROI)

5 Approved
RankDrain SegmentInterventionBudgetCrew HrsRisk ImpactAction
#1Encroachment Removal & Bank Reshaping₹2,20,00028 hrs (Crew 1)95 → 43 (-52)
#2Encroachment Removal & Bank Reshaping₹2,20,00028 hrs (Crew 2)91 → 41 (-50)
#3Encroachment Removal & Bank Reshaping₹2,20,00028 hrs (Crew 3)82 → 37 (-45)
#4Silt Trap & Trash Mesh Installation₹55,0006 hrs (Crew 1)70 → 57 (-13)
#5Encroachment Removal & Bank Reshaping₹2,20,00028 hrs (Crew 2)78 → 35 (-43)

⏳ Deferred Backlog (Pending Additional Fiscal Allocation)

3 Deferred
Exceeds total crew time limit (120 hrs)
Risk: 65/100Needs ₹55,000
Exceeds total crew time limit (120 hrs)
Risk: 52/100Needs ₹55,000
Exceeds both budget cap and crew capacity
Risk: 28/100Needs ₹85,000